Determination - Appvl Not Reqd (Stage 1)

The Proposed Development Is For The Installation And Deployment Of Solar Photovoltaic Cells To The Health Centre Roof. The Intention Is To Install 1011 Panels Across Four Roof Spaces In 8 Strings. The Installation Will Generate 435Kwp Over 2020Msq, With 41% Of The Energy Being Consumed Onsite And 59% Going To Grid. This Will Give The Medical Centre A 36% Level Of Self Sufficiency.

Map showing approximate location: Eagle Bridge Health And Wellbeing Centre, Dunwoody Way, Crewe, Cheshire, CW1 3AW
Eagle Bridge Health And Wellbeing Centre, Dunwoody Way, Crewe, Cheshire, CW1 3AW

Crewe Central

Application Registered
Feb. 2nd 2024
Target Decision Date
Mar. 29th 2024
Committee Date
None - Delegated Authority
Site Visit
None
Determination - Appvl Not Reqd (Stage 1)
Mar. 25th 2024

Case Officer

Joshua Greig

Applicant

Martin Dawson , Assura Plc

Assura Plc, 3, Barrington Road, Altrincham, Greater Manchester, WA14 1GY

Agent

Neil Butterfield , Carbonzero.Energy

Carbon Zero Energy, Warehouse Lane, Foulridge, Colne, Lancashire, BB8 7PP