Replacement for UPVC first floor window with traditional sash window to match existing. Refurbishment of staff welfare facilities. Provision of a disabled WC. Electrical Rewiring of General Lighting and Power, Fire detection system and emergency lighting. External ventilation to outside wall details of external cast iron cowls. Removal of a not original none-load bearing division wall to restore to original single office.